1. Introduction
  2. Acknowledgements
  3. Overview
  4. 1. Overview
  5. Core concepts
  6. 2. Fare integration
  7. 3. Electrification
  8. 4. High platforms
  9. 5. Rolling stock
  10. 6. Improved timetabling
  11. Phase 1: The infrastructure of 2027
  12. 7. Introduction
  13. 8. Fare integration
  14. 9. ME/SSL
  15. 10. RI
  16. Lines
  17. 11. ME/SSL
    1. 11.1. Timetabling for Phase 1
  18. 12. UP-N
    1. 12.1. Current and future demand
    2. 12.2. Existing conditions
    3. 12.3. Bus connections
      1. 12.3.1. The Kenosha bus system
      2. 12.3.2. The Waukegan bus system
      3. 12.3.3. The North Shore bus system
      4. 12.3.4. The Evanston bus system
    4. 12.4. Phase 1 - the current infrastructure
    5. 12.5. Transformative improvement
      1. 12.5.1. Electrification
      2. 12.5.2. Level boarding
      3. 12.5.3. Infill stations and other station facilities
      4. 12.5.4. Reaching Milwaukee
      5. 12.5.5. UP-N as the intercity route?
      6. 12.5.6. Quad-tracking
      7. 12.5.7. Cross-platform transfers with Purple
      8. 12.5.8. Phasing the transformative improvements
  19. Concepts and costs
  20. 13. Stations

Regional Rail for Chicagoland DRAFT